Manuals&Howtos

 

Transfer rod with marked positions 2012-10-31 09.54.11

1- Sample transfer.

  • Mount sample in transfer rod

  • Push transfer rod until first position (roughing pump stage). Wait 5 minutes. Pirani reading is not too reliable

  • Push transfer rod until second position (turbo pump stage). Leave there between 30min and 2hours (more if it is a powder sample). The gauge is broken

  • Push transfer rod to last position (inside XPS chamber). Wait until pressure drops below 10-7 Torr. Set gauge in 10-7 Torr range before turning on XPS (there is a pressure interlock)

  • Check that teflon piece at the end of rod is not protruding out.

 

 

2- Turn on system 

Main interlock box   2012-10-31 09.53.53

 

  • Press the main interlock button (green).

  • Turn on X-ray source (turn on Water On, HV On)

  • Increase slowly HV (big knob) to 6kV

  • Switch from stanby to operate (small switch knob in upper module)

  • Increase slowly HV to 13kV

  • Turn on analyzer electronics (5 VG white modules on the left rack)

  • Turn on the channeltrons voltage (switch in lowest VG module)

  • Adjust ratemeter. In test, if meter is not in the middle of the range, press increment button and then press up or down switch to move needle left or right.

  • Check USB module is on (both connected to PC and to power, green light on)

  •  Run program

    X-ray gun electronics 2012-10-31 09.53.45

 

3- Turn off instrument:

  • Turn of channeltron voltage

  • Turn off analyzer electronics (VG)

  • Lower X-ray gun from 13kV to 6kV

  • Turn knob to standby mode in x-ray gun upper module

  • Lower x-ray gun to 0kV

  • Turn off x-ray gun electronics

  • Turn off main interlock (press red button).

 

XPS analyzer electronics2012-10-31 09.53.07