Transfer rod with marked positions
1- Sample transfer.
-
Mount sample in transfer rod
-
Push transfer rod until first position (roughing pump stage). Wait 5 minutes. Pirani reading is not too reliable
-
Push transfer rod until second position (turbo pump stage). Leave there between 30min and 2hours (more if it is a powder sample). The gauge is broken
-
Push transfer rod to last position (inside XPS chamber). Wait until pressure drops below 10-7 Torr. Set gauge in 10-7 Torr range before turning on XPS (there is a pressure interlock)
-
Check that teflon piece at the end of rod is not protruding out.
2- Turn on system
Main interlock box
-
Press the main interlock button (green).
-
Turn on X-ray source (turn on Water On, HV On)
-
Increase slowly HV (big knob) to 6kV
-
Switch from stanby to operate (small switch knob in upper module)
-
Increase slowly HV to 13kV
-
Turn on analyzer electronics (5 VG white modules on the left rack)
-
Turn on the channeltrons voltage (switch in lowest VG module)
-
Adjust ratemeter. In test, if meter is not in the middle of the range, press increment button and then press up or down switch to move needle left or right.
-
Check USB module is on (both connected to PC and to power, green light on)
-
Run program
X-ray gun electronics
3- Turn off instrument:
-
Turn of channeltron voltage
-
Turn off analyzer electronics (VG)
-
Lower X-ray gun from 13kV to 6kV
-
Turn knob to standby mode in x-ray gun upper module
-
Lower x-ray gun to 0kV
-
Turn off x-ray gun electronics
-
Turn off main interlock (press red button).
XPS analyzer electronics